The Clinic
LHAP clinic and hydrotherapy pool / centre was built during the COVID-19 pandemic, and as such we have invested in the latest water, air filtration, ventilation and chemical control systems. Space for social distancing, pool disinfection, air and pool filtration and circulation systems have been at the forefront of our design. We have installed 2 pumps and 2 filters with coagulant for the pool. We do not recirculate air, and we have state of the art UV disinfection in addition to chlorine in the pool. Ultraviolet with low levels of chlorine is a very efficient disinfectant and is much kinder to the skin than conventional chlorinated pool water.
We have followed PWTAG (Pool Water Treatment Advisory Group) and ATACP (Aquatic Therapy Association of Chartered Physiotherapists) standards throughout our design process. We want you to be confident that you are receiving the best possible care when you are with us.
The build and pool were designed by Consultant Aquatic Physiotherapist Dr Heather Epps in conjunction with pool and architectural experts.
The whole ground floor including the clinic and training rooms are wheelchair accessible and M building regulation compliant. We have full hoisting facilities, plinths and beds that can be raised and lowered, and the doors are push button automated at wheelchair height.
Our facilities can also be hired.
Hydrotherapy Pool
Read more
Physiotherapy Rooms / Gym
Read more
Office and Meeting Rooms
Read more